TAKE A LOOK AT OUR CASE STUDIES

CASE STUDIES

HOUSING

 

Completed Void Property

press to zoom
press to zoom
press to zoom
press to zoom

Listed Building

Internal and external refurbishment and redecoration of a Grade II listed building in St Johns Wood. The works included full internal remodelling and redecoration including heating and electrical works. External rerendering, roof refurbishment and timber window repairs. All works completed with the client living on site

press to zoom
press to zoom
press to zoom
press to zoom

RETAIL

 

INTU Lakeside Shopping Centre

Replacement of mall tiling. Works undertaken out of hours providing minimal disruption to centre operations

IMG_0407
IMG_0407
press to zoom
IMG_0409
IMG_0409
press to zoom
IMG_0408
IMG_0408
press to zoom
IMG_0406
IMG_0406
press to zoom

 

Replacement of service doors. Works comprised new secure steel door sets, full automation, internal PIR, external sensors and full integration into the centres existing fire alarm and door entry systems

press to zoom
press to zoom
press to zoom
press to zoom

First phase of paving stone renewal across public walkways. Works completed with minimal disruption to the public and the shopping centre

press to zoom
press to zoom
press to zoom
press to zoom

INTU Shopping Centre, Milton Keynes

Loading bay gates manufactured and installed to clients total satisfaction with zero impact on centres operational capability

press to zoom
press to zoom
press to zoom
press to zoom
 

EDUCATION

CASE STUDY COMING SOON

HEALTH

 

Royal National Orthopaedic Hospital, London W1

 

Covid-19 protective screens installed in a ‘live’ environment with minimum disruption to staff

press to zoom
press to zoom
press to zoom
press to zoom

Royal National Orthopaedic Hospital Stanmore

 

Refurbishment of disabled toilets before and after shots. Works comprise full redecoration, new cap and cove flooring and fully compliant suite

IMG_0269
IMG_0269

Disabled toilet adaptions at Royal National Orthopaedic Hospital Stanmore. Before and after shots showing full refurbishment of disabled toilets

press to zoom
IMG_0302
IMG_0302
press to zoom
IMG_0300
IMG_0300
press to zoom
IMG_0301
IMG_0301
press to zoom

First 2 phases of main access road completed. 2400m2 planed, resurfaced and repainted in two weekends with full traffic management ensuring 24/7 ambulance access if required

press to zoom
press to zoom
press to zoom
press to zoom

Care Home

 

Refurbishment of a care and dementia home for one of our valued clients. Works include new bathrooms, wet rooms, toilets, corridor and communal area redecoration, new ceilings, flooring and kitchens

press to zoom
press to zoom
press to zoom
press to zoom

COMMERCIAL

 

INTU Head Office, 40 Broadway SW1

Works included repair and refurbishment of timber and metal windows and doors, powder coating of metal vents, grilles and cappings and provision of new planters.

press to zoom
press to zoom
press to zoom
press to zoom

INDUSTRIAL

 

CASE STUDY COMING SOON